
Originally Posted by
layoneil

Originally Posted by
FFXIFlux
Then don't use points. For us we could have up to 60 people at an event.
we won't, i'm not the guy insulting people who don't agree with them. calling them retards who can't run Excel. not having the desire to doesn't mean not being able to.
=SUM() function in very simple steps
leave the first row blank, for titling
column one: name column, leave blank (should be A2)
column two: total points column, click square (B2) and then click the fx button (Insert function). Excel defaults this to SUM, so click ok.
column 3-infinite: Click on the 3rd square (C2) and drag its ass all the way to the far end of the sheet (to the right, square IV2), and press OK. If you're witty enough, you can simply click on square B2 and in the text box next to the Insert Function button, type in
=SUM(C2:IV2).
To the left of the sheet are numbers, Click on the number 2, and your entire row should be selected. at the bottom left of grid A2 is a little black box. Click that box and drag it as far down as necessary.
Fill in the names of all your LS members in the A column. The B column will automatically update to show the members current points. In the columns following C, you can insert numerics (positive and negative) to reflect the point-per-member distribution for every event.
HOLY SHIT I JUST MADE A WORKING POINT SHEET TEMPLATE THAT A 5 YEAR OLD CAN USE AND TYPED ALL THIS SHIT OUT IN THREE MINUTES.